Foothills Bio-Energy

815-D Virginia Street SW | PO Box 795 | Lenoir, NC 28645 Fluidyne Conditioner installed August 1, 2011.   Blow-down reduced 90%, from twice a day to once every 2 weeks.  Boiler inspected by Zurich Insurance Co...

Learn More

Letter from Caldwell Green Commission

Mr. Manning: Your company, Fluidyne International, was mentioned and praised by Eddie Pitts of Bernhardt Furniture, Lenoir, NC at a meeting I attended last Friday.  The Champions for Green is a conversation held quarterly by a group of business people in the Future Forward region of North Carolina who are interested in developing a business environment that is clean,...

Learn More

Carolina Public Press

      The burgeoning business of clean energy in Western North Carolina is something Jim Manning actually has been involved with for decades. Fluidyne International LLC owner and CEO Jim Manning checks part of the boiler system at the Buncombe County Detention Center. Manning’s innovative boiler water conditioning process reduces operational and...

Learn More

Dissolved Mineral and Oxygen Saturation Points are Triggered by Physical Action

In 1827, Dr. Brown theorized water molecules were in constant motion, when water temperatures increased, increased molecular motion was observed.   Flame or microwave radiation is the most common way to increase the Brownian motion with the side affect of increasing water temperature.     Because heat is obvious, “heat” alone is considered the cause of hard water...

Learn More

Fletcher Business Park (A Case Study)

Beginning in the 2007-08 heater season, a non-chemical treatment water system was installed by Fluidyne International. The new treatment system reduced boiler corrosion and deposits while significantly reducing boiler corrosion and deposits which significantly reducing boiler blowdown water. With visual inspection, rusty deposits in the  boiler and condensate return...

Learn More

Bernhardt Furniture Plant

1839 Morganton Blvd Lenoir, NC 28645-0740 The last 4 windows on the right are the length of the boilers, which are two stories high and there are 2 boilers in that room.   Lots of horse power.   Fluidyne Conditioning installed March 1, 2011. Boiler blow-down was reduced 67%, from six times a week to twice a week.   Zurich Insurance Company inspected all three...

Learn More