Fletcher Business Park (A Case Study)

Fletcher Business Park (A Case Study)

Sight glasses of 150 HP comfort heating boiler at Fletcher Business Park: 900,000 sq ft building. Boiler installation demonstrated the ability of Fluidyne to prevent scale and corrosion. After installing the Fluidyne System, corrosion and scale products were removed without chemicals.

Beginning in the 2007-08 heater season, a non-chemical treatment water system was installed by Fluidyne International. The new treatment system reduced boiler corrosion and deposits while significantly reducing boiler corrosion and deposits which significantly reducing boiler blowdown water. With visual inspection, rusty deposits in the  boiler and condensate return lines were disappearing from the walls of the wetted areas. The annual heating (heating season) savings related just to blowdown, including water, sewer, and energy costs, was $4,070. The new system is saving 189,000 gallons of water annually. Significant additional savings were achieved in eliminated chemical costs and chemical servicing.