Buncombe Detention Center

Buncombe Detention Center

Monthly Service Began February 1, 2010 No chemicals or softeners are used in steamers, boilers or cooling towers, after installation of the Fluidyne System.

 

 

Fluidyne Int Case History: Buncombe County Detention Center

 

Buncombe County Detention Center 20 Davidson Street Asheville, NC 28801 Conditioner installed 2/ 01/ 10.

Serviced February 22, 2013

3years, 1,116 days

Fluidyne Process saved $1,100 per year, $3,300, by replacing chemicals.

Water entering the boilers metered.

Total for 3 years; 1,475,810 gallons.

Chemicals eliminated; 6,794 Lbs

Water saved 394,013gals; $3,900 saved.

Energy saved; 588+ Million Btu.

Total: 3-year savings; $7,200, plus 588 Million Btu.

 

Serviced March 01, 2013

3+years, 1,125 days

Fluidyne Process saved $1,100 per year, $3,300, by replacing chemicals.

Water entering the boilers metered.

Total to 3/1/13; 1,500,900 gallons.

Chemicals eliminated; 7,054 Lbs

Water saved 400,710gals; $3,960 saved.

Energy saved; 598+ Million Btu.

Total: savings to date; $7,200, plus 598+ Million Btu