Blog

Steam Producing Boiler

Posted by on Oct 6, 2014 in Products | 0 comments

Steam Producing Boiler

Picture is of a 1000hp steam producing boiler, 70gpm from water to steam. From 600 to 1000 of these operate in North Carolina. Chemical companies charge $1,600 per month and more for water treatment.In water and energy savings I will save them $5,000 a year compared to chem. And, it is a very hard sale to make. Will be on line with these 2 boilers, another will be installed where I am standing, come Nov 1. 150gpm 2,000 HP steam boiler non-chemical water...

read more

Fluid Conditioning System and Process of Conditioning Fluid Patent

Posted by on Sep 16, 2014 in Patent | 0 comments

Fluid Conditioning System and Process of Conditioning Fluid Patent

(12) United States Patent Manning (10) Patent No.: US 7,740,764 B1 (45) Date of Patent: Jun. 22, 2010 (54) FLUID CONDITIONING SYSTEM AND PROCESS OF CONDITIONING FLUID (76) Inventor: James Manning, P.O. Box 5025, Hendersonville, NC (US) 28793 ( * ) Notice: Subject to any disclaimer, the term of this patent is extended or adjusted under 35 U.S.C 154(b) by 40 days. (21) Appl. No.: 12/034,167 (22) Filed: Feb. 20, 2008 Related U.S. Application Data (60) Provisional application No. 60/890,920, filled on Feb.21, 2007. (51) Int. Cl. B01D 35/06...

read more

Foothills Bio-Energy

Posted by on Feb 28, 2013 in Case Studies, Posting | 0 comments

Foothills Bio-Energy

815-D Virginia Street SW | PO Box 795 | Lenoir, NC 28645 Fluidyne Conditioner installed August 1, 2011.   Blow-down reduced 90%, from twice a day to once every 2 weeks.  Boiler inspected by Zurich Insurance Co twice.

read more

Letter from Caldwell Green Commission

Posted by on Feb 28, 2013 in Case Studies | 0 comments

Letter from Caldwell Green Commission

Mr. Manning: Your company, Fluidyne International, was mentioned and praised by Eddie Pitts of Bernhardt Furniture, Lenoir, NC at a meeting I attended last Friday.  The Champions for Green is a conversation held quarterly by a group of business people in the Future Forward region of North Carolina who are interested in developing a business environment that is clean, socially responsible, energy efficient, and environmentally friendly.  As you are aware, Bernhardt Furniture has established itself as a leader in these areas of global business...

read more

Carolina Public Press

Posted by on Feb 28, 2013 in Case Studies | 0 comments

Carolina Public Press

      The burgeoning business of clean energy in Western North Carolina is something Jim Manning actually has been involved with for decades. Fluidyne International LLC owner and CEO Jim Manning checks part of the boiler system at the Buncombe County Detention Center. Manning’s innovative boiler water conditioning process reduces operational and maintenance costs and has less impact on the environment. Photo by Kathleen O. Davis. Manning is the owner and CEO of Fluidyne International LLC, a Henderson County-based company...

read more

Dissolved Mineral and Oxygen Saturation Points are Triggered by Physical Action

Posted by on Feb 28, 2013 in Case Studies | 0 comments

Dissolved Mineral and Oxygen Saturation Points are Triggered by Physical Action

In 1827, Dr. Brown theorized water molecules were in constant motion, when water temperatures increased, increased molecular motion was observed.   Flame or microwave radiation is the most common way to increase the Brownian motion with the side affect of increasing water temperature.     Because heat is obvious, “heat” alone is considered the cause of hard water scaling. The temperature level where scale forms is referred to as the “saturation point”.  Heat conceals the fact the water molecule increased violent motion has broken the...

read more

Fletcher Business Park (A Case Study)

Posted by on Feb 28, 2013 in Case Studies | 0 comments

Fletcher Business Park (A Case Study)

Beginning in the 2007-08 heater season, a non-chemical treatment water system was installed by Fluidyne International. The new treatment system reduced boiler corrosion and deposits while significantly reducing boiler corrosion and deposits which significantly reducing boiler blowdown water. With visual inspection, rusty deposits in the  boiler and condensate return lines were disappearing from the walls of the wetted areas. The annual heating (heating season) savings related just to blowdown, including water, sewer, and energy costs, was...

read more

Bernhardt Furniture Plant

Posted by on Feb 20, 2013 in Case Studies, Content Slider | 0 comments

Bernhardt Furniture Plant

1839 Morganton Blvd Lenoir, NC 28645-0740 The last 4 windows on the right are the length of the boilers, which are two stories high and there are 2 boilers in that room.   Lots of horse power.   Fluidyne Conditioning installed March 1, 2011. Boiler blow-down was reduced 67%, from six times a week to twice a week.   Zurich Insurance Company inspected all three boilers  two times....

read more

Installations

Posted by on Mar 22, 2012 in Case Studies, Content Slider | 0 comments

Installations

Here is a partial list of customers serviced monthly in California, Nevada and Baja Mexico –1978 to 2004. Note: boilers listed are steam pressure vessels. No chemicals or softeners were used. Office building in Hollywood, (3) 400 hp B & W boilers; 13 years Sky Chefs at LA Int. Airport, 3 boilers. 11 years Sky Chefs at Las Vegas, 2 boilers. 15 years Sky Chefs at Costa Mesa, 1 boiler. 7 years Sky Chefs at Ontario, 1 boiler. 7 years Fish packing plant, Ensenada Baja Mexico, 600, 400 & 300 HP boilers. 4 years Orange Coast College,...

read more

Buncombe Detention Center

Posted by on Mar 22, 2012 in Buncombe Detention Center, Case Studies, Content Slider | 0 comments

Buncombe Detention Center

Monthly Service Began February 1, 2010 No chemicals or softeners are used in steamers, boilers or cooling towers, after installation of the Fluidyne System.     Fluidyne Int Case History: Buncombe County Detention Center   Buncombe County Detention Center 20 Davidson Street Asheville, NC 28801 Conditioner installed 2/ 01/ 10. Serviced February 22, 2013 3years, 1,116 days Fluidyne Process saved $1,100 per year, $3,300, by replacing chemicals. ◙ Water entering the boilers metered. Total for 3 years; 1,475,810 gallons. Chemicals...

read more